The Gabrovo town bypass is part of the Transeuropean transport corridor No IX Bucharest -Ruse -Dimitrovgrad- Alexandropolis and it includes the implementation of rehablitation, reconstructuion and new construction of 5 sections separated in the following 4 stages:

  • Stage I from km 0+000 to km 7+670, with total length of 7.670 km- rehabilitation;
  • Stage II from km 7+670 km 10+940.74, total length 3.270 km- rehabilitation and reconstruction;
  • Stage III from km 10+940.74 to km 16+010, total length 5.069 bkm- new construction;
  • Stage IV from km 16+010 to km 0+124.50, total length 4.115 - new construction;
  • Road connection from km 0+000 (km 20+124.5 from the direct trace) to km 3+130, total length 3.130 km- new construction 
X
X
X

1. Consultancy Services related to Design and implementation of emergency repair and reinstatement works on the viaduct at 67+027 Trakya Motorway.

The structure consists of two separate (independant) constructions for each traffic lane and it is  wit 14 spans each with 20.4 m and total length 280.0. Each of the constructions is divided in to two separate temperature-independent sections each with M 75 expantion joints at the abutments   and above pier 7.

 

The value of the constructin works is 7 500 000 BGN

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X


2013 Transcosult-BG Ltd. All rights reserved
Web design by QALISTIC QALISTICCMS
Home  About us  Services  Projects  References  Contacts